Skip to content
3D Printing & AdditiveDeliveredComposite layup tooling

Composite layup tooling — Automotive

Printed layup mandrels and wash-out cores for composites. Delivered for a automotive client in Delhi NCR.

Location
Delhi NCR
Year
2022
Duration
25 weeks
Team
12 engineers
Interactive 3D · drag to rotate
−64%
tool lead time
−78%
tool cost
152
tools

The challenge

The automotive team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on FDM, Wash-out cores and Fusion 360, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Operator training delivered in Gujarati, Hindi and English

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.