Low-volume production — Electronics
Series production of end-use polymer parts without tooling. Delivered for a electronics client in Anand.
- Location
- Anand
- Year
- 2021
- Duration
- 18 weeks
- Team
- 10 engineers
- 5k
- parts per month
- ₹9L
- tooling avoided
- 1.38
- dimensional Cpk
The challenge
Leadership wanted measurable results inside one quarter, with no disruption to running operations.
What we built
Built in our Motera lab, validated on a replica rig, then commissioned on site in days using MJF and Fusion 360.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Before-and-after measurements agreed with the client up front
- Designed, built and supported from Motera, Ahmedabad
- Documentation, drawings and source handed over at close
- Runs on-premises; no data leaves the site unless agreed
Related 3D Printing projects
3D PrintingLiveMedical devices · Bhavnagar · 2021
Low-volume production — Medical devices
Series production of end-use polymer parts without tooling. Delivered for a medical devices client in Bhavnagar.
- 29k
- parts per month
- ₹26L
- tooling avoided
- 1.41
- dimensional Cpk
3D PrintingLiveEV startup · Mundra · 2020
Low-volume production — EV startup
Series production of end-use polymer parts without tooling. Delivered for a ev startup client in Mundra.
- 31k
- parts per month
- ₹23L
- tooling avoided
- 1.38
- dimensional Cpk
3D PrintingLiveIndustrial IoT · Delhi NCR · 2022
Low-volume production — Industrial IoT
Series production of end-use polymer parts without tooling. Delivered for a industrial iot client in Delhi NCR.
- 39k
- parts per month
- ₹46L
- tooling avoided
- 1.67
- dimensional Cpk
3D PrintingR&DDrones · Indore · 2021
Low-volume production — Drones
Series production of end-use polymer parts without tooling. Delivered for a drones client in Indore.
- 2k
- parts per month
- ₹53L
- tooling avoided
- 1.73
- dimensional Cpk
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.