Skip to content
3D Printing & AdditiveLiveLow-volume production

Low-volume production — Medical devices

Series production of end-use polymer parts without tooling. Delivered for a medical devices client in Bhavnagar.

Location
Bhavnagar
Year
2021
Duration
16 weeks
Team
3 engineers
Interactive 3D · drag to rotate
29k
parts per month
₹26L
tooling avoided
1.41
dimensional Cpk

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on MJF, SLS and Fusion 360, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Remote monitoring and over-the-air updates included
  • Before-and-after measurements agreed with the client up front
  • Documentation, drawings and source handed over at close

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.