Topology-optimised brackets — Railways
Generative brackets that cut mass while meeting load cases. Delivered for a railways client in Sanand.
- Location
- Sanand
- Year
- 2026
- Duration
- 29 weeks
- Team
- 12 engineers
- −42%
- mass
- 1.51
- safety factor
- 191
- parts
The challenge
The railways team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.
What we built
We ran a two-week discovery sprint, then built and fielded the system end to end on nTop, ANSYS and DMLS, with operator training and an SLA.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Before-and-after measurements agreed with the client up front
- Runs on-premises; no data leaves the site unless agreed
- Documentation, drawings and source handed over at close
- Designed, built and supported from Motera, Ahmedabad
Related 3D Printing projects
3D PrintingLiveAerospace · Gandhinagar · 2025
Topology-optimised brackets — Aerospace
Generative brackets that cut mass while meeting load cases. Delivered for a aerospace client in Gandhinagar.
- −37%
- mass
- 2.14
- safety factor
- 300
- parts
3D PrintingDeliveredAutomotive · Rajkot · 2026
Topology-optimised brackets — Automotive
Generative brackets that cut mass while meeting load cases. Delivered for a automotive client in Rajkot.
- −51%
- mass
- 2.58
- safety factor
- 299
- parts
3D PrintingR&DSpace · Motera, Ahmedabad · 2022
Topology-optimised brackets — Space
Generative brackets that cut mass while meeting load cases. Delivered for a space client in Motera, Ahmedabad.
- −51%
- mass
- 2.90
- safety factor
- 26
- parts
3D PrintingLiveMotorsport · Mumbai · 2026
Topology-optimised brackets — Motorsport
Generative brackets that cut mass while meeting load cases. Delivered for a motorsport client in Mumbai.
- −40%
- mass
- 2.32
- safety factor
- 83
- parts
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.