The challenge
Existing vendors had delivered pieces of a inspection crawler robot system, but nobody owned the integration and the pilot had stalled.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on ROS 2 with Ultrasonic NDT, integrated into existing systems through Fusion 360.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Designed, built and supported from Motera, Ahmedabad
- Runs on-premises; no data leaves the site unless agreed
- Operator training delivered in Gujarati, Hindi and English
- Safety case reviewed with the client's EHS team
Related Robotics projects
RoboticsLiveOil & gas · Nagpur · 2022
Inspection crawler robot — Oil & gas
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a oil & gas client in Nagpur.
- −98%
- confined-space entries
- −77%
- inspection time
- 633 m
- range
RoboticsDeliveredPower plant · Dahej · 2021
Inspection crawler robot — Power plant
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a power plant client in Dahej.
- −99%
- confined-space entries
- −63%
- inspection time
- 720 m
- range
RoboticsLiveTelecom · Jaipur · 2023
Inspection crawler robot — Telecom
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a telecom client in Jaipur.
- −97%
- confined-space entries
- −61%
- inspection time
- 256 m
- range
RoboticsLiveWater utility · Hazira · 2023
Inspection crawler robot — Water utility
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a water utility client in Hazira.
- −83%
- confined-space entries
- −71%
- inspection time
- 155 m
- range
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.