The challenge
The power plant team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.
What we built
We ran a two-week discovery sprint, then built and fielded the system end to end on ROS 2, Ultrasonic NDT and OpenCV, with operator training and an SLA.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Remote monitoring and over-the-air updates included
- Designed, built and supported from Motera, Ahmedabad
- Runs on-premises; no data leaves the site unless agreed
- Before-and-after measurements agreed with the client up front
Related Robotics projects
RoboticsLiveOil & gas · Nagpur · 2022
Inspection crawler robot — Oil & gas
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a oil & gas client in Nagpur.
- −98%
- confined-space entries
- −77%
- inspection time
- 633 m
- range
RoboticsLiveChemicals · Anand · 2025
Inspection crawler robot — Chemicals
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a chemicals client in Anand.
- −93%
- confined-space entries
- −83%
- inspection time
- 278 m
- range
RoboticsLiveTelecom · Jaipur · 2023
Inspection crawler robot — Telecom
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a telecom client in Jaipur.
- −97%
- confined-space entries
- −61%
- inspection time
- 256 m
- range
RoboticsLiveWater utility · Hazira · 2023
Inspection crawler robot — Water utility
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a water utility client in Hazira.
- −83%
- confined-space entries
- −71%
- inspection time
- 155 m
- range
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.