Inspection crawler robot — Telecom
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a telecom client in Jaipur.
- Location
- Jaipur
- Year
- 2023
- Duration
- 9 weeks
- Team
- 12 engineers
- −97%
- confined-space entries
- −61%
- inspection time
- 256 m
- range
The challenge
Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in telecom.
What we built
We owned the whole stack — hardware, firmware, models and dashboards — using ROS 2, Ultrasonic NDT, OpenCV so there was one accountable team.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
- Before-and-after measurements agreed with the client up front
- Designed, built and supported from Motera, Ahmedabad
- Documentation, drawings and source handed over at close
Related Robotics projects
RoboticsLiveOil & gas · Nagpur · 2022
Inspection crawler robot — Oil & gas
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a oil & gas client in Nagpur.
- −98%
- confined-space entries
- −77%
- inspection time
- 633 m
- range
RoboticsDeliveredPower plant · Dahej · 2021
Inspection crawler robot — Power plant
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a power plant client in Dahej.
- −99%
- confined-space entries
- −63%
- inspection time
- 720 m
- range
RoboticsLiveChemicals · Anand · 2025
Inspection crawler robot — Chemicals
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a chemicals client in Anand.
- −93%
- confined-space entries
- −83%
- inspection time
- 278 m
- range
RoboticsLiveWater utility · Hazira · 2023
Inspection crawler robot — Water utility
Magnetic or tracked crawlers inspecting tanks, pipes and ducts. Delivered for a water utility client in Hazira.
- −83%
- confined-space entries
- −71%
- inspection time
- 155 m
- range
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.