Painting and coating robot — Aerospace
Explosion-proof spray painting with offline path generation from CAD. Delivered for a aerospace client in Surat.
- Location
- Surat
- Year
- 2026
- Duration
- 22 weeks
- Team
- 6 engineers
- 25%
- paint saved
- −76%
- finish defects
- −3.1
- booth staff
The challenge
Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in aerospace.
What we built
We ran a two-week discovery sprint, then built and fielded the system end to end on RoboDK-class OLP, Python and Profinet, with operator training and an SLA.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Before-and-after measurements agreed with the client up front
- Documentation, drawings and source handed over at close
- Runs on-premises; no data leaves the site unless agreed
- Designed, built and supported from Motera, Ahmedabad
Related Robotics projects
RoboticsPilotAutomotive · Dahej · 2022
Painting and coating robot — Automotive
Explosion-proof spray painting with offline path generation from CAD. Delivered for a automotive client in Dahej.
- 33%
- paint saved
- −65%
- finish defects
- −2.4
- booth staff
RoboticsDeliveredFurniture · Mehsana · 2020
Painting and coating robot — Furniture
Explosion-proof spray painting with offline path generation from CAD. Delivered for a furniture client in Mehsana.
- 26%
- paint saved
- −42%
- finish defects
- −2.4
- booth staff
RoboticsPilotAgri-equipment · Jaipur · 2023
Painting and coating robot — Agri-equipment
Explosion-proof spray painting with offline path generation from CAD. Delivered for a agri-equipment client in Jaipur.
- 21%
- paint saved
- −77%
- finish defects
- −3.6
- booth staff
RoboticsLiveAppliances · Morbi · 2023
Painting and coating robot — Appliances
Explosion-proof spray painting with offline path generation from CAD. Delivered for a appliances client in Morbi.
- 24%
- paint saved
- −52%
- finish defects
- −3.3
- booth staff
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.