Painting and coating robot — Appliances
Explosion-proof spray painting with offline path generation from CAD. Delivered for a appliances client in Morbi.
- Location
- Morbi
- Year
- 2023
- Duration
- 21 weeks
- Team
- 13 engineers
- 24%
- paint saved
- −52%
- finish defects
- −3.3
- booth staff
The challenge
Existing vendors had delivered pieces of a painting and coating robot system, but nobody owned the integration and the pilot had stalled.
What we built
Built in our Motera lab, validated on a replica rig, then commissioned on site in days using RoboDK-class OLP and Profinet.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Documentation, drawings and source handed over at close
- Safety case reviewed with the client's EHS team
- Operator training delivered in Gujarati, Hindi and English
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
Related Robotics projects
RoboticsPilotAutomotive · Dahej · 2022
Painting and coating robot — Automotive
Explosion-proof spray painting with offline path generation from CAD. Delivered for a automotive client in Dahej.
- 33%
- paint saved
- −65%
- finish defects
- −2.4
- booth staff
RoboticsDeliveredFurniture · Mehsana · 2020
Painting and coating robot — Furniture
Explosion-proof spray painting with offline path generation from CAD. Delivered for a furniture client in Mehsana.
- 26%
- paint saved
- −42%
- finish defects
- −2.4
- booth staff
RoboticsPilotAgri-equipment · Jaipur · 2023
Painting and coating robot — Agri-equipment
Explosion-proof spray painting with offline path generation from CAD. Delivered for a agri-equipment client in Jaipur.
- 21%
- paint saved
- −77%
- finish defects
- −3.6
- booth staff
RoboticsDeliveredAerospace · Surat · 2026
Painting and coating robot — Aerospace
Explosion-proof spray painting with offline path generation from CAD. Delivered for a aerospace client in Surat.
- 25%
- paint saved
- −76%
- finish defects
- −3.1
- booth staff
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.