RoboticsDeliveredPalletising robot

Palletising robot — Ceramics

Mixed-case palletising with vision-based box detection and pattern planning. Delivered for a ceramics client in Anand.

Location
Anand
Year
2025
Duration
31 weeks
Team
10 engineers
Interactive 3D · drag to rotate
1,058
cases per hour
−100%
injuries
−2.6
shift staff

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on ROS 2, MoveIt 2 and RealSense, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Runs on-premises; no data leaves the site unless agreed
  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Documentation, drawings and source handed over at close