Skip to content
Unmanned VehiclesDeliveredPower line inspection UAV

Power line inspection UAV — Industrial park

Close-up insulator and conductor inspection along transmission lines. Delivered for a industrial park client in Anand.

Location
Anand
Year
2022
Duration
10 weeks
Team
8 engineers
Interactive 3D · drag to rotate
657
km inspected
93%
defect recall
0
outages

The challenge

Existing vendors had delivered pieces of a power line inspection uav system, but nobody owned the integration and the pilot had stalled.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using PX4, YOLO, ONNX Runtime so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Remote monitoring and over-the-air updates included
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Documentation, drawings and source handed over at close
  • Operator training delivered in Gujarati, Hindi and English

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.