Power line inspection UAV — Railways

Close-up insulator and conductor inspection along transmission lines. Delivered for a railways client in GIFT City.

Location
GIFT City
Year
2022
Duration
26 weeks
Team
9 engineers
Interactive 3D · drag to rotate
1,273
km inspected
92%
defect recall
0
outages

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on PX4, YOLO and ONNX Runtime, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Safety case reviewed with the client's EHS team
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Operator training delivered in Gujarati, Hindi and English
  • Before-and-after measurements agreed with the client up front