Power line inspection UAV — Railways
Close-up insulator and conductor inspection along transmission lines. Delivered for a railways client in GIFT City.
- Location
- GIFT City
- Year
- 2022
- Duration
- 26 weeks
- Team
- 9 engineers
- 1,273
- km inspected
- 92%
- defect recall
- 0
- outages
The challenge
Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.
What we built
We ran a two-week discovery sprint, then built and fielded the system end to end on PX4, YOLO and ONNX Runtime, with operator training and an SLA.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Safety case reviewed with the client's EHS team
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
- Operator training delivered in Gujarati, Hindi and English
- Before-and-after measurements agreed with the client up front
Related Unmanned projects
UnmannedDeliveredTransmission utility · Sanand · 2022
Power line inspection UAV — Transmission utility
Close-up insulator and conductor inspection along transmission lines. Delivered for a transmission utility client in Sanand.
- 426
- km inspected
- 95%
- defect recall
- 0
- outages
UnmannedDeliveredDistribution utility · Jamnagar · 2024
Power line inspection UAV — Distribution utility
Close-up insulator and conductor inspection along transmission lines. Delivered for a distribution utility client in Jamnagar.
- 521
- km inspected
- 96%
- defect recall
- 0
- outages
UnmannedDeliveredWind farm · Sanand · 2021
Power line inspection UAV — Wind farm
Close-up insulator and conductor inspection along transmission lines. Delivered for a wind farm client in Sanand.
- 1,718
- km inspected
- 91%
- defect recall
- 0
- outages
UnmannedDeliveredIndustrial park · Anand · 2022
Power line inspection UAV — Industrial park
Close-up insulator and conductor inspection along transmission lines. Delivered for a industrial park client in Anand.
- 657
- km inspected
- 93%
- defect recall
- 0
- outages
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.