Skip to content
Unmanned VehiclesDeliveredPower line inspection UAV

Power line inspection UAV — Wind farm

Close-up insulator and conductor inspection along transmission lines. Delivered for a wind farm client in Sanand.

Location
Sanand
Year
2021
Duration
28 weeks
Team
6 engineers
Interactive 3D · drag to rotate
1,718
km inspected
91%
defect recall
0
outages

The challenge

The wind farm team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on PX4 with YOLO, integrated into existing systems through Jira API.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Documentation, drawings and source handed over at close
  • Operator training delivered in Gujarati, Hindi and English
  • Safety case reviewed with the client's EHS team

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.