Condition monitoring network — Pharmaceutical

Wireless vibration and temperature sensors on rotating equipment. Delivered for a pharmaceutical client in Anand.

Location
Anand
Year
2025
Duration
5 weeks
Team
10 engineers
Interactive 3D · drag to rotate
263
sensors
−49%
unplanned stops
4.2 yr
battery life

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on LoRaWAN, ESP32 and MQTT, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Before-and-after measurements agreed with the client up front
  • Runs on-premises; no data leaves the site unless agreed
  • Designed, built and supported from Motera, Ahmedabad
  • Operator training delivered in Gujarati, Hindi and English