IoT & 5GDeliveredEnergy monitoring

Energy monitoring — Data centre

Sub-metering and power-quality analytics across plants and buildings. Delivered for a data centre client in Mundra.

Location
Mundra
Year
2022
Duration
24 weeks
Team
7 engineers
Interactive 3D · drag to rotate
1,486
meters
21%
energy saved
11.8 mo
payback

The challenge

The data centre team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on Modbus, ESP32 and TimescaleDB, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Before-and-after measurements agreed with the client up front
  • Designed, built and supported from Motera, Ahmedabad
  • Runs on-premises; no data leaves the site unless agreed
  • Documentation, drawings and source handed over at close