Skip to content
IoT & 5GLiveEnergy monitoring

Energy monitoring — Hospital

Sub-metering and power-quality analytics across plants and buildings. Delivered for a hospital client in Vadodara.

Location
Vadodara
Year
2020
Duration
26 weeks
Team
13 engineers
Interactive 3D · drag to rotate
455
meters
9%
energy saved
4.8 mo
payback

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using Modbus and TimescaleDB.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Remote monitoring and over-the-air updates included
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Safety case reviewed with the client's EHS team
  • Before-and-after measurements agreed with the client up front

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.