IoT & 5GPilotSmart building BMS

Smart building BMS — Hospital

Occupancy-aware HVAC and lighting control with dashboards. Delivered for a hospital client in Nagpur.

Location
Nagpur
Year
2024
Duration
33 weeks
Team
6 engineers
Interactive 3D · drag to rotate
−34%
energy
970
zones
−72%
comfort complaints

The challenge

Existing vendors had delivered pieces of a smart building bms system, but nobody owned the integration and the pilot had stalled.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using BACnet, LoRaWAN, Node-RED so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Operator training delivered in Gujarati, Hindi and English
  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Runs on-premises; no data leaves the site unless agreed