Skip to content
IoT & 5GDeliveredSmart building BMS

Smart building BMS — Hotel

Occupancy-aware HVAC and lighting control with dashboards. Delivered for a hotel client in Morbi.

Location
Morbi
Year
2022
Duration
28 weeks
Team
9 engineers
Interactive 3D · drag to rotate
−24%
energy
1,029
zones
−66%
comfort complaints

The challenge

Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in hotel.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using BACnet and Node-RED.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Runs on-premises; no data leaves the site unless agreed
  • Safety case reviewed with the client's EHS team

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.