Smart building BMS — Mall

Occupancy-aware HVAC and lighting control with dashboards. Delivered for a mall client in Jamnagar.

Location
Jamnagar
Year
2021
Duration
14 weeks
Team
8 engineers
Interactive 3D · drag to rotate
−34%
energy
1,546
zones
−50%
comfort complaints

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on BACnet with LoRaWAN, integrated into existing systems through Python.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Safety case reviewed with the client's EHS team
  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Documentation, drawings and source handed over at close