Smart building BMS — Office

Occupancy-aware HVAC and lighting control with dashboards. Delivered for a office client in Pune.

Location
Pune
Year
2021
Duration
30 weeks
Team
12 engineers
Interactive 3D · drag to rotate
−25%
energy
1,810
zones
−53%
comfort complaints

The challenge

The office team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on BACnet with LoRaWAN, integrated into existing systems through Python.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Remote monitoring and over-the-air updates included
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Before-and-after measurements agreed with the client up front
  • Operator training delivered in Gujarati, Hindi and English