Skip to content
IoT & 5GDeliveredSmart metering for power

Smart metering for power — Industrial park

RF-mesh and RedCap smart meters with outage detection. Delivered for a industrial park client in Surat.

Location
Surat
Year
2026
Duration
13 weeks
Team
8 engineers
Interactive 3D · drag to rotate
58k
meters
98%
daily read
−28%
truck rolls

The challenge

The industrial park team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on 5G RedCap, RF mesh and Kafka, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Remote monitoring and over-the-air updates included
  • Runs on-premises; no data leaves the site unless agreed
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Designed, built and supported from Motera, Ahmedabad

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.