IoT & 5GLiveSmart metering for power

Smart metering for power — Power distribution

RF-mesh and RedCap smart meters with outage detection. Delivered for a power distribution client in Visakhapatnam.

Location
Visakhapatnam
Year
2021
Duration
7 weeks
Team
11 engineers
Interactive 3D · drag to rotate
39k
meters
99%
daily read
−30%
truck rolls

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using 5G RedCap, RF mesh, Kafka so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Designed, built and supported from Motera, Ahmedabad
  • Documentation, drawings and source handed over at close
  • Runs on-premises; no data leaves the site unless agreed