Skip to content
IoT & 5GR&DSmart metering for power

Smart metering for power — SEZ

RF-mesh and RedCap smart meters with outage detection. Delivered for a sez client in Hyderabad.

Location
Hyderabad
Year
2025
Duration
22 weeks
Team
13 engineers
Interactive 3D · drag to rotate
286k
meters
98%
daily read
−23%
truck rolls

The challenge

Existing vendors had delivered pieces of a smart metering for power system, but nobody owned the integration and the pilot had stalled.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on 5G RedCap with RF mesh, integrated into existing systems through Go.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Runs on-premises; no data leaves the site unless agreed
  • Operator training delivered in Gujarati, Hindi and English
  • Safety case reviewed with the client's EHS team

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.