Skip to content
IoT & 5GDeliveredSmart metering for power

Smart metering for power — Township

RF-mesh and RedCap smart meters with outage detection. Delivered for a township client in Hyderabad.

Location
Hyderabad
Year
2024
Duration
6 weeks
Team
10 engineers
Interactive 3D · drag to rotate
252k
meters
99%
daily read
−27%
truck rolls

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using 5G RedCap and Kafka.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Operator training delivered in Gujarati, Hindi and English
  • Remote monitoring and over-the-air updates included
  • Before-and-after measurements agreed with the client up front

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.