Skip to content
IoT & 5GDeliveredSmart water metering

Smart water metering — Housing society

NB-IoT water meters with leak alerts and billing integration. Delivered for a housing society client in Pune.

Location
Pune
Year
2023
Duration
7 weeks
Team
7 engineers
Interactive 3D · drag to rotate
75k
meters
−19%
non-revenue water
98%
read success

The challenge

Existing vendors had delivered pieces of a smart water metering system, but nobody owned the integration and the pilot had stalled.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using NB-IoT, Zephyr, Kafka so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Designed, built and supported from Motera, Ahmedabad
  • Remote monitoring and over-the-air updates included
  • Before-and-after measurements agreed with the client up front

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.