Smart water metering — Industrial park

NB-IoT water meters with leak alerts and billing integration. Delivered for a industrial park client in Visakhapatnam.

Location
Visakhapatnam
Year
2023
Duration
17 weeks
Team
4 engineers
Interactive 3D · drag to rotate
99k
meters
−21%
non-revenue water
99%
read success

The challenge

The industrial park team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on NB-IoT with Zephyr, integrated into existing systems through Go.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Before-and-after measurements agreed with the client up front
  • Documentation, drawings and source handed over at close
  • Safety case reviewed with the client's EHS team
  • Runs on-premises; no data leaves the site unless agreed