Skip to content
IoT & 5GDeliveredSmart water metering

Smart water metering — Smart city

NB-IoT water meters with leak alerts and billing integration. Delivered for a smart city client in Hazira.

Location
Hazira
Year
2024
Duration
26 weeks
Team
10 engineers
Interactive 3D · drag to rotate
59k
meters
−18%
non-revenue water
99%
read success

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using NB-IoT and Kafka.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Safety case reviewed with the client's EHS team
  • Before-and-after measurements agreed with the client up front
  • Documentation, drawings and source handed over at close

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.