Smart water metering — Township

NB-IoT water meters with leak alerts and billing integration. Delivered for a township client in Mehsana.

Location
Mehsana
Year
2026
Duration
31 weeks
Team
7 engineers
Interactive 3D · drag to rotate
80k
meters
−10%
non-revenue water
98%
read success

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on NB-IoT, Zephyr and Kafka, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Runs on-premises; no data leaves the site unless agreed
  • Safety case reviewed with the client's EHS team
  • Documentation, drawings and source handed over at close
  • Remote monitoring and over-the-air updates included