Metal spare parts on demand — Defence
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a defence client in Hazira.
- Location
- Hazira
- Year
- 2021
- Duration
- 16 weeks
- Team
- 7 engineers
- 102 days
- downtime avoided
- −21%
- inventory
- 376
- parts qualified
The challenge
The defence team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on DMLS with SolidWorks, integrated into existing systems through Inconel.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Remote monitoring and over-the-air updates included
- Designed, built and supported from Motera, Ahmedabad
- Runs on-premises; no data leaves the site unless agreed
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
Related 3D Printing projects
3D PrintingDeliveredRailways · Jamnagar · 2022
Metal spare parts on demand — Railways
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a railways client in Jamnagar.
- 56 days
- downtime avoided
- −40%
- inventory
- 394
- parts qualified
3D PrintingPilotPower plant · GIFT City · 2024
Metal spare parts on demand — Power plant
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a power plant client in GIFT City.
- 74 days
- downtime avoided
- −44%
- inventory
- 321
- parts qualified
3D PrintingLiveOil & gas · Jaipur · 2021
Metal spare parts on demand — Oil & gas
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a oil & gas client in Jaipur.
- 85 days
- downtime avoided
- −49%
- inventory
- 264
- parts qualified
3D PrintingR&DTextile machinery · Jaipur · 2024
Metal spare parts on demand — Textile machinery
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a textile machinery client in Jaipur.
- 85 days
- downtime avoided
- −35%
- inventory
- 114
- parts qualified