Metal spare parts on demand — Textile machinery
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a textile machinery client in Jaipur.
- Location
- Jaipur
- Year
- 2024
- Duration
- 32 weeks
- Team
- 14 engineers
- 85 days
- downtime avoided
- −35%
- inventory
- 114
- parts qualified
The challenge
Leadership wanted measurable results inside one quarter, with no disruption to running operations.
What we built
We ran a two-week discovery sprint, then built and fielded the system end to end on DMLS, SolidWorks and CT inspection, with operator training and an SLA.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Operator training delivered in Gujarati, Hindi and English
- Designed, built and supported from Motera, Ahmedabad
- Documentation, drawings and source handed over at close
- Runs on-premises; no data leaves the site unless agreed
Related 3D Printing projects
3D PrintingDeliveredRailways · Jamnagar · 2022
Metal spare parts on demand — Railways
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a railways client in Jamnagar.
- 56 days
- downtime avoided
- −40%
- inventory
- 394
- parts qualified
3D PrintingDeliveredDefence · Hazira · 2021
Metal spare parts on demand — Defence
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a defence client in Hazira.
- 102 days
- downtime avoided
- −21%
- inventory
- 376
- parts qualified
3D PrintingPilotPower plant · GIFT City · 2024
Metal spare parts on demand — Power plant
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a power plant client in GIFT City.
- 74 days
- downtime avoided
- −44%
- inventory
- 321
- parts qualified
3D PrintingLiveOil & gas · Jaipur · 2021
Metal spare parts on demand — Oil & gas
DMLS reprints of obsolete metal spares from scans and drawings. Delivered for a oil & gas client in Jaipur.
- 85 days
- downtime avoided
- −49%
- inventory
- 264
- parts qualified
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.