Skip to content
RoboticsDeliveredRobotic welding cell

Robotic welding cell — Furniture

Seam-tracking arc welding for short batches and thin sheet. Delivered for a furniture client in Bengaluru.

Location
Bengaluru
Year
2023
Duration
31 weeks
Team
4 engineers
Interactive 3D · drag to rotate
−62%
rework
13.8 min
programming time
3.8×
weld speed

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on ROS 2 with PCL, integrated into existing systems through Qt.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Remote monitoring and over-the-air updates included
  • Documentation, drawings and source handed over at close
  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.