Skip to content
RoboticsLiveRobotic welding cell

Robotic welding cell — Railways

Seam-tracking arc welding for short batches and thin sheet. Delivered for a railways client in Hazira.

Location
Hazira
Year
2024
Duration
5 weeks
Team
3 engineers
Interactive 3D · drag to rotate
−36%
rework
8.1 min
programming time
2.5×
weld speed

The challenge

The railways team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using ROS 2 and Modbus.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Runs on-premises; no data leaves the site unless agreed

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.