Skip to content
3D, Digital Twins & ScanningDeliveredFactory layout simulation

Factory layout simulation — Electronics

Discrete-event simulation with a 3D twin for layout what-ifs. Delivered for a electronics client in Rajkot.

Location
Rajkot
Year
2024
Duration
29 weeks
Team
13 engineers
Interactive 3D · drag to rotate
−13%
travel distance
181
scenarios run
₹4.7cr
capex avoided

The challenge

Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in electronics.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on SimPy, Three.js and glTF, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Runs on-premises; no data leaves the site unless agreed
  • Before-and-after measurements agreed with the client up front
  • Designed, built and supported from Motera, Ahmedabad

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.