Factory layout simulation — Textile

Discrete-event simulation with a 3D twin for layout what-ifs. Delivered for a textile client in Jamnagar.

Location
Jamnagar
Year
2020
Duration
33 weeks
Team
11 engineers
Interactive 3D · drag to rotate
−19%
travel distance
205
scenarios run
₹6.6cr
capex avoided

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on SimPy with Three.js, integrated into existing systems through Python.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Operator training delivered in Gujarati, Hindi and English
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Before-and-after measurements agreed with the client up front