Skip to content
3D, Digital Twins & ScanningDeliveredFactory layout simulation

Factory layout simulation — Engineering

Discrete-event simulation with a 3D twin for layout what-ifs. Delivered for a engineering client in Junagadh.

Location
Junagadh
Year
2022
Duration
23 weeks
Team
6 engineers
Interactive 3D · drag to rotate
−14%
travel distance
205
scenarios run
₹10.2cr
capex avoided

The challenge

The engineering team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using SimPy and glTF.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Before-and-after measurements agreed with the client up front
  • Remote monitoring and over-the-air updates included

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.