3D Printing & AdditiveDeliveredConformal-cooled moulds

Conformal-cooled moulds — Plastics

Printed mould inserts with conformal cooling channels. Delivered for a plastics client in Mehsana.

Location
Mehsana
Year
2026
Duration
16 weeks
Team
3 engineers
Interactive 3D · drag to rotate
−28%
cycle time
−62%
warpage
16
inserts

The challenge

The plastics team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using DMLS and nTop.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Operator training delivered in Gujarati, Hindi and English
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Runs on-premises; no data leaves the site unless agreed
  • Documentation, drawings and source handed over at close