Collaborative assembly cobot — Appliances
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a appliances client in Vapi.
- Location
- Vapi
- Year
- 2025
- Duration
- 30 weeks
- Team
- 5 engineers
- −28%
- cycle time
- 6 min
- changeover
- 97%
- first-pass yield
The challenge
The appliances team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on ROS 2 with MoveIt 2, integrated into existing systems through Qt.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Remote monitoring and over-the-air updates included
- Operator training delivered in Gujarati, Hindi and English
- Documentation, drawings and source handed over at close
- Runs on-premises; no data leaves the site unless agreed
Related Robotics projects
RoboticsR&DElectronics · Hyderabad · 2026
Collaborative assembly cobot — Electronics
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a electronics client in Hyderabad.
- −29%
- cycle time
- 5 min
- changeover
- 100%
- first-pass yield
RoboticsDeliveredAutomotive · Mehsana · 2020
Collaborative assembly cobot — Automotive
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a automotive client in Mehsana.
- −18%
- cycle time
- 19 min
- changeover
- 97%
- first-pass yield
RoboticsR&DMedical devices · Bhavnagar · 2025
Collaborative assembly cobot — Medical devices
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a medical devices client in Bhavnagar.
- −31%
- cycle time
- 18 min
- changeover
- 99%
- first-pass yield
RoboticsDeliveredToys · Nagpur · 2026
Collaborative assembly cobot — Toys
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a toys client in Nagpur.
- −22%
- cycle time
- 8 min
- changeover
- 98%
- first-pass yield