Collaborative assembly cobot — Medical devices
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a medical devices client in Bhavnagar.
- Location
- Bhavnagar
- Year
- 2025
- Duration
- 8 weeks
- Team
- 9 engineers
- −31%
- cycle time
- 18 min
- changeover
- 99%
- first-pass yield
The challenge
Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in medical devices.
What we built
Built in our Motera lab, validated on a replica rig, then commissioned on site in days using ROS 2 and Force-torque.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Documentation, drawings and source handed over at close
- Designed, built and supported from Motera, Ahmedabad
- Safety case reviewed with the client's EHS team
- Runs on-premises; no data leaves the site unless agreed
Related Robotics projects
RoboticsR&DElectronics · Hyderabad · 2026
Collaborative assembly cobot — Electronics
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a electronics client in Hyderabad.
- −29%
- cycle time
- 5 min
- changeover
- 100%
- first-pass yield
RoboticsLiveAppliances · Vapi · 2025
Collaborative assembly cobot — Appliances
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a appliances client in Vapi.
- −28%
- cycle time
- 6 min
- changeover
- 97%
- first-pass yield
RoboticsDeliveredAutomotive · Mehsana · 2020
Collaborative assembly cobot — Automotive
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a automotive client in Mehsana.
- −18%
- cycle time
- 19 min
- changeover
- 97%
- first-pass yield
RoboticsDeliveredToys · Nagpur · 2026
Collaborative assembly cobot — Toys
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a toys client in Nagpur.
- −22%
- cycle time
- 8 min
- changeover
- 98%
- first-pass yield