Collaborative assembly cobot — Electronics
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a electronics client in Hyderabad.
- Location
- Hyderabad
- Year
- 2026
- Duration
- 28 weeks
- Team
- 5 engineers
- −29%
- cycle time
- 5 min
- changeover
- 100%
- first-pass yield
The challenge
Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.
What we built
We ran a two-week discovery sprint, then built and fielded the system end to end on ROS 2, MoveIt 2 and Force-torque, with operator training and an SLA.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Before-and-after measurements agreed with the client up front
- Documentation, drawings and source handed over at close
- Designed, built and supported from Motera, Ahmedabad
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
Related Robotics projects
RoboticsLiveAppliances · Vapi · 2025
Collaborative assembly cobot — Appliances
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a appliances client in Vapi.
- −28%
- cycle time
- 6 min
- changeover
- 97%
- first-pass yield
RoboticsDeliveredAutomotive · Mehsana · 2020
Collaborative assembly cobot — Automotive
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a automotive client in Mehsana.
- −18%
- cycle time
- 19 min
- changeover
- 97%
- first-pass yield
RoboticsR&DMedical devices · Bhavnagar · 2025
Collaborative assembly cobot — Medical devices
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a medical devices client in Bhavnagar.
- −31%
- cycle time
- 18 min
- changeover
- 99%
- first-pass yield
RoboticsDeliveredToys · Nagpur · 2026
Collaborative assembly cobot — Toys
Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a toys client in Nagpur.
- −22%
- cycle time
- 8 min
- changeover
- 98%
- first-pass yield
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.