RoboticsDeliveredCollaborative assembly cobot

Collaborative assembly cobot — Toys

Cobots working beside people on screwing, gluing and fitting tasks. Delivered for a toys client in Nagpur.

Location
Nagpur
Year
2026
Duration
31 weeks
Team
10 engineers
Interactive 3D · drag to rotate
−22%
cycle time
8 min
changeover
98%
first-pass yield

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on ROS 2, MoveIt 2 and Force-torque, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Before-and-after measurements agreed with the client up front
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Safety case reviewed with the client's EHS team