Skip to content
RoboticsLiveConstruction robotics

Construction robotics — Bridges

Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a bridges client in Delhi NCR.

Location
Delhi NCR
Year
2023
Duration
20 weeks
Team
3 engineers
Interactive 3D · drag to rotate
4.9×
task speed
2.8 mm
layout error
−50%
injuries

The challenge

Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in bridges.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using ROS 2 and IFC.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Before-and-after measurements agreed with the client up front
  • Designed, built and supported from Motera, Ahmedabad
  • Operator training delivered in Gujarati, Hindi and English

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.