Construction robotics — Housing

Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a housing client in Mundra.

Location
Mundra
Year
2020
Duration
4 weeks
Team
10 engineers
Interactive 3D · drag to rotate
3.7×
task speed
3.4 mm
layout error
−53%
injuries

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on ROS 2 with Total station, integrated into existing systems through C++20.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Remote monitoring and over-the-air updates included
  • Operator training delivered in Gujarati, Hindi and English
  • Runs on-premises; no data leaves the site unless agreed
  • Documentation, drawings and source handed over at close