Construction robotics — High-rise
Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a high-rise client in Vadodara.
- Location
- Vadodara
- Year
- 2025
- Duration
- 31 weeks
- Team
- 7 engineers
- 2.1×
- task speed
- 3.4 mm
- layout error
- −79%
- injuries
The challenge
Existing vendors had delivered pieces of a construction robotics system, but nobody owned the integration and the pilot had stalled.
What we built
We owned the whole stack — hardware, firmware, models and dashboards — using ROS 2, Total station, IFC so there was one accountable team.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Designed, built and supported from Motera, Ahmedabad
- Before-and-after measurements agreed with the client up front
- Operator training delivered in Gujarati, Hindi and English
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
Related Robotics projects
RoboticsLiveMetro rail · Bengaluru · 2021
Construction robotics — Metro rail
Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a metro rail client in Bengaluru.
- 2.1×
- task speed
- 4.9 mm
- layout error
- −87%
- injuries
RoboticsLiveBridges · Delhi NCR · 2023
Construction robotics — Bridges
Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a bridges client in Delhi NCR.
- 4.9×
- task speed
- 2.8 mm
- layout error
- −50%
- injuries
RoboticsDeliveredIndustrial sheds · Chennai · 2023
Construction robotics — Industrial sheds
Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a industrial sheds client in Chennai.
- 4.4×
- task speed
- 2.8 mm
- layout error
- −69%
- injuries
RoboticsLiveHousing · Mundra · 2020
Construction robotics — Housing
Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a housing client in Mundra.
- 3.7×
- task speed
- 3.4 mm
- layout error
- −53%
- injuries