Skip to content
RoboticsPilotConstruction robotics

Construction robotics — High-rise

Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a high-rise client in Vadodara.

Location
Vadodara
Year
2025
Duration
31 weeks
Team
7 engineers
Interactive 3D · drag to rotate
2.1×
task speed
3.4 mm
layout error
−79%
injuries

The challenge

Existing vendors had delivered pieces of a construction robotics system, but nobody owned the integration and the pilot had stalled.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using ROS 2, Total station, IFC so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Operator training delivered in Gujarati, Hindi and English
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.