Construction robotics — Metro rail

Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a metro rail client in Bengaluru.

Location
Bengaluru
Year
2021
Duration
15 weeks
Team
5 engineers
Interactive 3D · drag to rotate
2.1×
task speed
4.9 mm
layout error
−87%
injuries

The challenge

The metro rail team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on ROS 2 with Total station, integrated into existing systems through C++20.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Remote monitoring and over-the-air updates included
  • Before-and-after measurements agreed with the client up front
  • Documentation, drawings and source handed over at close
  • Operator training delivered in Gujarati, Hindi and English

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.