Skip to content
RoboticsDeliveredConstruction robotics

Construction robotics — Industrial sheds

Rebar tying, drilling and layout robots for faster, safer sites. Delivered for a industrial sheds client in Chennai.

Location
Chennai
Year
2023
Duration
11 weeks
Team
10 engineers
Interactive 3D · drag to rotate
4.4×
task speed
2.8 mm
layout error
−69%
injuries

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on ROS 2, Total station and IFC, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Runs on-premises; no data leaves the site unless agreed

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.