Skip to content
Unmanned VehiclesDeliveredMine and tunnel UGV

Mine and tunnel UGV — Defence

Rugged UGVs mapping and inspecting mines and tunnels. Delivered for a defence client in Hazira.

Location
Hazira
Year
2026
Duration
27 weeks
Team
6 engineers
Interactive 3D · drag to rotate
40
km mapped
−90%
human entries
7.6 cm
map accuracy

The challenge

Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in defence.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on ROS 2, LiDAR SLAM and Gas sensors, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Remote monitoring and over-the-air updates included
  • Documentation, drawings and source handed over at close
  • Before-and-after measurements agreed with the client up front

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.