Skip to content
Unmanned VehiclesDeliveredMine and tunnel UGV

Mine and tunnel UGV — Oil & gas

Rugged UGVs mapping and inspecting mines and tunnels. Delivered for a oil & gas client in Bhavnagar.

Location
Bhavnagar
Year
2025
Duration
29 weeks
Team
13 engineers
Interactive 3D · drag to rotate
10
km mapped
−88%
human entries
6.9 cm
map accuracy

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on ROS 2 with LiDAR SLAM, integrated into existing systems through Open3D.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Runs on-premises; no data leaves the site unless agreed
  • Remote monitoring and over-the-air updates included
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Designed, built and supported from Motera, Ahmedabad

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.