Mine and tunnel UGV — Metro rail

Rugged UGVs mapping and inspecting mines and tunnels. Delivered for a metro rail client in Rajkot.

Location
Rajkot
Year
2020
Duration
5 weeks
Team
12 engineers
Interactive 3D · drag to rotate
29
km mapped
−99%
human entries
6.7 cm
map accuracy

The challenge

The metro rail team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using ROS 2, LiDAR SLAM, Gas sensors so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Runs on-premises; no data leaves the site unless agreed
  • Remote monitoring and over-the-air updates included
  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front